§ 16.12.030. Fees.  


Latest version.
  • General subdivision fees to cover general expenses related to processing subdivisions. A subdivision fee will be charged.

    A.

    Fees for each subdivision procedure will be as follows. In addition to fees to cover the general expenses of processing of subdivisions, the village shall be paid an engineering review fee for minor subdivision, major subdivision—preliminary plat, and major subdivision—final plat applications within the municipal jurisdiction of the village. Estimated construction cost will be determined by the subdivider's engineering firm presenting an estimated cost to the village. Council approval is required to approve the cost basis.

    1.

    Summary procedure:

    a.

    A fee of two hundred fifty dollars shall be the base fee assessed for each application; and

    b.

    An additional fee of ten dollars per each additional lot created will be added to the base fee.

    2.

    Summary procedure—Family split:

    a.

    A fee of fifty dollars shall be assessed.

    3.

    Minor subdivision procedure:

    a.

    A fee of two hundred fifty dollars shall be the base fee assessed for each application;

    b.

    An additional fee of ten dollars per each additional lot created will be added to the base fee; and

    c.

    A fee of one and a half percent of the estimated construction cost will be assessed for the engineering review.

    4.

    Major subdivision procedure—Preliminary plat:

    a.

    A fee of two hundred fifty dollars shall be the base fee assessed for each application;

    b.

    An additional fee of ten dollars per each additional lot created will be added to the base fee; and

    c.

    A fee of one and a half percent of the estimated construction cost will be assessed for the engineering review.

    5.

    Major subdivision procedure—Final plat:

    a.

    A fee of two hundred fifty dollars shall be the base fee assessed for each application;

    b.

    An additional fee of ten dollars per each additional lot created will be added to the base fee; and

    c.

    A fee of one and a half percent of the estimated construction cost will be assessed for the engineering review.

    6.

    Plat vacation procedure:

    a.

    A fee of twenty-five dollars shall be assessed for each application.

    B.

    Additional Fees. If through no fault of the village additional review and inspection times are required, an additional fee may be established on a direct cost basis. Any and all engineering or other professional fees incurred by the village under the chapter shall be paid for by the applicant at the time they are incurred.

    C.

    Method of Payment. Fees shall be made payable to the village. All fees, other than village engineering fees, shall be paid at the time of application for preliminary approval. Fees are nonrefundable.

( Ord. No. 430, 12-21-2017 )